NEW – Hydraulic Operation
Cardok 2.0 launched in the Summer of 2006, with a new hydraulic lift which is faster and quieter than the previous geared system.
The power unit is situated in the service
area of the Cardok and is extremely quiet
when operating. Each lift cycle requires
the power unit to run for 3½ minutes in
order to store sufficient energy in the
accumulator for the next lift. Lifting and
lowering time is approximately 15 seconds
each way.. |